30 LBS GAS TRANSFER LINE IN SHIRAZ
30 lbs Gas Transfer Line in Shiraz
This project has been announced to general bid by National Gas Company of Fars Province on 08/11/2003 and next was notified to this company.
This plan consists of construction and installation of pipe with diameter of 30 lbs and establishment of C.G.S station with capacity of 300,000 m3 .
Always, with increment of population in big cities, the energy consumption is increased to the same ratio, so the necessity to perform this project in the city like Shiraz is noticeable. Thus, National Iranian Gas Company prepared and notified the plan immediately with receiving required budget. Actually the another of the aims of this plan was construction of Gas pump stations for automobile usage in the city considering the increment of C.N.G consumption request instead of oil that was widely initiated in Iran since 2003.
It is to be mentioned that, this project takes as long as 18 months and the rate of 90,000 m3 excavation, 3400 m3 concreting , 110/000 ID of welding was done and finally with installing the mentioned pipe, this project has been terminated to the nearest of T.B.S station in Shiraz
If you think you have the talent and tenacity to help us, contact:
Public Tender Announcement for the Purchase of Pig Signaller
Arak Petrochemical
Public Tender Announcement for the Purchase of Passive Defense & Explosion Proof Door & Window
Public Tender Announcement for the Purchase of (AISS & PCS) CCTV System